Cleanroom Roller Screw Actuator
Estimate RPM and loaded screw friction heat, compare containment options, and prepare a qualification RFQ. Start with a preset, then edit your motion inputs.
Sizing & Containment Tool
Live RPM and loaded screw loss estimates. Candidate containment options require supplier qualification; no ISO class is predicted.
Preliminary motion & loaded loss
Lead: 2.0 mm2,400 RPM
12.3 W
61.5 W
280 W
Loaded screw losses only; thermal suitability is not assessed. No capacity or ISO certification. Peak force/stroke are RFQ inputs. Do not assume self-locking: specify rated holding and stopping provisions.
Assessment limits & candidate containment
Cleanroom air still transfers heat; local airflow and cooling equipment need facility approval. This estimate covers loaded screw friction only. Motor, bearing, seal, preload, acceleration, return-stroke and idle losses are excluded. No safe temperature or duty limit can be inferred. Supply thermal resistance, ambient temperature and the complete cycle for review.
Compare an enclosed mechanism with captured exhaust against a bellows barrier. Qualify the assembled actuator at the specified speed, stroke, load and orientation; no ISO class rating is predicted.
Select grease with documented load, speed, temperature and process compatibility. Use the supplier-approved metered quantity; there is no universal cleanroom fill percentage. Incidental-food-contact registration does not establish sterile-process suitability.
Positive purge can carry internal debris into the clean zone. Route contaminated exhaust to a captured return and verify flow direction. Pressure, flow and filtration must be engineered and tested; this tool does not calculate them.
View / Select RFQ Brief Text
Reproduce the default worksheet result
Original software execution captured 12 November 2026. This is a hypothetical calculation, not an actuator test, cleanroom certificate or customer installation.
Select Reset to Defaults. Inputs: target ISO Class 2, cleanroom air, planetary mechanism, 3.5 kN continuous thrust, 8 kN peak thrust, 80 mm/s speed, 200 mm stroke, 2 mm/rev lead, 20% loaded duty and 82% assumed screw efficiency. Expect 2,400 RPM, 280 W mechanical output, 61.5 W loaded screw loss and 12.3 W duty-weighted loss. Peak thrust, stroke and target cleanliness are requirements only; thermal suitability and assembly capacity remain unassessed.

Publisher: Roller Screw Actuators · Run your motion inputs · Request qualification review
Executive Summary: Key Engineering Takeaways
Air class is an input, not a certificate
Request equipment suitability evidence for the exact assembly and motion envelope; the worksheet does not assign an ISO rating.
Loaded screw loss is only part of heat
Add omitted losses and validate thermal paths before setting temperature or duty limits. Vacuum suppresses convection; cleanroom air does not.
Use exact lubricant evidence
Krytox LVP has published typical vapor-pressure data. Product chemistry alone does not establish outgassing or process compatibility.
Sterile suitability needs separate controls
ISO particle classification does not establish microbial control or decontamination compatibility. Agree these acceptance requirements separately.
✓ Recommended For
- Semiconductor lithography, reticle inspection, and wafer transfer robots.
- Biopharmaceutical aseptic vial stoppering and barrier isolator presses (EU GMP Grade A/B).
- Thermal vacuum simulation chambers and optical satellite alignment stages.
- Battery manufacturing dry rooms and OLED flat-panel display handling.
✕ Not Recommended For
- Standard unsealed industrial applications where low initial purchase cost is primary.
- Applications outside the chosen supplier’s rated stroke, speed, load or containment envelope.
- Systems requiring intrinsic self-locking without power: roller screws backdrive under load.
1. Cleanroom Linear Motion Tribology & Particle Mechanics
Understanding how rolling line contact, Hertzian stress, and microscopic thread shear generate airborne debris.
A cleanroom roller screw actuator is an assembled motion system whose contamination behavior depends on contacts, guides, lubricant, seals, enclosure and the operating cycle. The screw mechanism alone cannot establish equipment suitability.
Threaded roller contacts share load, but actual stress, slip and wear depend on geometry and preload. No verified evidence on this page supports a fixed stress-reduction multiplier or fewer particles than every ball screw. Compare configuration-specific emissions under equivalent duty.
| Option | Potential reason to shortlist | Decision limit / next check |
|---|---|---|
| Roller screw actuator | High thrust in a compact mechanical package | Internal contacts, seals and lubricant can generate contamination. Require assembled equipment test data. |
| Ball screw actuator | Broad supplier choice and service experience | An enclosed, qualified ball screw may fit better than an untested roller screw. Compare at the same duty. |
| Direct linear motor | Avoids the screw transmission and its lubrication | Still needs guidance, thermal management and vertical holding provisions; obtain whole-axis emissions data. |
| Drive outside the clean zone | Keeps serviceable mechanics away from the process | Adds feedthrough, bellows or magnetic coupling constraints; assess alignment, stiffness and load capacity. |
2. Environmental Cleanliness Standards: ISO 14644 & EU GMP Annex 1
Airborne particulate thresholds, dynamic equipment assessment methodology, and pharmaceutical sterility rules.
Use ISO 14644-1 for the air cleanliness target and ISO 14644-14:2026 for equipment suitability by airborne particles. Specify particle sizes and the exact configuration, background and motion envelope to be tested. A room classification is not a standalone actuator certificate.
EU GMP Annex 1 adds contamination control, microbial and process requirements. Its classification and monitoring tables serve different purposes, and at-rest limits differ from in-operation limits. Neither a cleanroom class nor a helium leak check establishes sterility.
| Requirement | Known reference | What to specify |
|---|---|---|
| Air cleanliness | ISO 14644-1:2015 | Class, particle size(s), occupancy state and sampling plan. No equipment certification follows automatically. |
| Equipment particle suitability | ISO 14644-14:2026 | Exact actuator assembly, load, velocity, stroke, orientation, background and sampling locations. |
| Grade A classification, ≥0.5 µm | 3,520 particles/m³ at rest and in operation (Annex 1 Table 1) | Also qualify contamination control and microbiological requirements. |
| Grade B classification, ≥0.5 µm | 3,520 at rest; 352,000 in operation (Annex 1 Table 1) | Do not label Grade B simply equivalent to ISO Class 5 in operation. |
| Grade A ≥5 µm | Classification Table 1: not specified; monitoring Table 5: 29 particles/m³ | Use the applicable task and contamination control strategy; do not substitute a legacy ISO threshold. |
3. Roller Screw Architecture Suitability: Planetary vs Recirculating vs Inverted
Kinematic trade-offs, roller synchronization mechanisms, and cleanroom encapsulation envelopes.
Compare planetary, recirculating and inverted mechanisms within actual supplier load/speed envelopes. Lead means travel per revolution; it need not equal thread pitch. Fine lead changes RPM and mechanical resolution but does not guarantee system positioning accuracy.
Packaging, guidance, feedback, seals and service access determine the assembled axis. No verified evidence here establishes a universal particle, life or micro-slip ranking between these architectures.
| Architecture | Integration opportunity | Supplier evidence needed |
|---|---|---|
| Planetary | Continuous threaded roller engagement; compare thrust/lead packages | Actual load/speed envelope, lubrication, heat and particle data. No intrinsic particle ranking is claimed. |
| Recirculating | May provide fine leads depending on the design | Return/cam kinematics, achievable velocity, noise, service life and tested emissions. Fine lead alone does not set positioning accuracy. |
| Inverted | Can package a screw mechanism inside a cylinder envelope | Moving interfaces, thermal path, feedback, output sealing and maintenance access. Packaging is not hermeticity. |
4. Cleanroom Lubrication & Vacuum Outgassing Control
Exact-grade evidence, screening limits and supplier-validated lubricant quantities.
Choose the exact lubricant formulation for load, speed, temperature, environment and cleaning compatibility. PFPE products are candidates for some vacuum duties, not interchangeable approvals. The cited Krytox LVP sheet lists typical vapor pressure below 1×10⁻¹³ Torr at 20°C and below 1×10⁻⁵ Torr at 200°C; do not apply the room-temperature value to a warm actuator.
NASA’s guide describes specimen outgassing screening at 125°C for 24 hours and uses TML ≤1.0% and CVCM ≤0.10% as selection criteria. These are not universal ASTM E595 pass limits. This page has no verified exact-product TML/CVCM dataset, so it does not rank greases or plot invented product measurements.
Specify a supplier-validated metered grease amount and relubrication plan. No universal cleanroom fill percentage is established; too much grease can migrate or churn, while too little can impair contact life.
| Process | Candidate direction | Evidence before selection |
|---|---|---|
| Atmospheric cleanroom | Supplier-approved metered grease | Load, speed, temperature, migration and particle tests of the assembly. |
| Vacuum / sensitive optics | Exact low-vapor-pressure formulation | Vapor pressure versus temperature, specimen outgassing record, deposition budget and operating test. |
| Aseptic isolator | Lubricant isolated from process contact | Compatibility with decontamination cycle, barriers, residue limits and contamination control strategy. H1 registration is insufficient. |
| Dry film proposal | Only where a supplier supports the contact duty | Friction, wear debris, adhesion, life and humidity dependence. Dry film is not particle-free. |
| Item | Verified public information | Unknown / action |
|---|---|---|
| Krytox LVP vapor pressure | Chemours typical values: <1×10⁻¹³ Torr at 20°C; <1×10⁻⁵ Torr at 200°C | Typical product data, not a guaranteed chamber gas load or a prediction for a warm assembly. |
| Krytox LVP TML / CVCM | Not supplied in the cited Chemours product sheet | Request a traceable exact-formulation test record; no measured E595 value is plotted on this page. |
| Other PFPE or hydrocarbon greases | No exact-grade test records verified for this page | No numerical ranking or automatic pass/fail. Ask for matched test conditions and suitability for rolling contacts. |
| NASA selection criteria | ≤1.0% TML and ≤0.10% CVCM in the cited guide | These screening criteria do not establish molecular deposition, particle generation or sterile suitability. |
5. Dynamic Sealing & Barrier Containment Systems
Hermetic edge-welded metal bellows, spring-energized PTFE lip seals, and CDA/N2 purge barriers.
Start with the process boundary, contamination budget and failure modes. Bellows can avoid a sliding shaft interface, but pressure thrust, fatigue, side loading and available nesting length must be checked for the actual design. No universal leak rate, service life or zero-egress guarantee follows from the material or cleanroom class.
Dynamic seals and captured exhaust may be alternatives. Positive housing purge alone can discharge internal wear debris toward the process. Define pressure direction, capture flow, exhaust destination and utility-failure interlocks; do not use a generic pressure/flow recipe as a containment design.
| Barrier | Benefit to evaluate | Failure boundary / mitigation |
|---|---|---|
| Welded bellows | Can separate mechanics from process without a sliding shaft seal | Finite fatigue life, pressure force and nesting length. Obtain cycle curves and a tested leak budget. |
| Dynamic lip seals | May suit repeated travel with a compact package | Wear and permeation depend on material, speed and pressure. Validate replacement interval and emissions. |
| Captured exhaust / extraction | Can direct contaminated gas away from the process | Verify pressure direction and loss-of-suction behavior. Do not exhaust debris into the clean zone. |
| Differential pumping | Reduces gas transport across a staged vacuum boundary | Requires gas-load and conductance sizing, compatible pump stages and interlocks. Not interchangeable with facility suction. |
| Option | Upfront scope | Recurring cost / evidence gap |
|---|---|---|
| Lip seals | Seal package, rod finish and captured exhaust | Wear, overhaul access, retest and downtime; no universal travel life or replacement period is known. |
| Differential pumping | Pump stages, lines, valves, gauges and interlocks | Power, maintenance, leak finding and recovery; no universal capture efficiency is known. |
| Bellows barrier | Custom sizing, pressure-load analysis and leak/cycle testing | Finite rated cycles, inspection and cartridge replacement; no infinite-life claim or generic S-N curve is available. |
| External drive / magnetic coupling | Space, alignment, feedthrough and load analysis | Coupling force margin, guide wear and boundary tests; compare total installed cost, not the screw price alone. |
6. High Vacuum Integration & Differential Pumping Ports
Gas-load budgets, line conductance, pressure stages and fault handling.
Separate atmospheric particle extraction from high-vacuum gas-load control. A pumped intermediate cavity can reduce transport across a final seal, but performance depends on seal leakage, gas species, line conductance and pump speed at the operating pressure.
Facility suction is not a high-vacuum pump specification. Agree absolute pressures at each stage, trapped-volume treatment, compatible backing/high-vacuum pumping, leak budgets and interlocks with the chamber designer. No fixed particle-capture percentage or exponential reduction is asserted.
7. Thermal Dissipation in Cleanrooms & Vacuum Chambers
Loaded-loss equations, omitted heat sources and thermal validation boundaries.
The worksheet assumes constant positive motoring load during the entered loaded duty fraction. RPM = 60 × speed / lead; mechanical power = force in kN × speed in mm/s; loaded screw loss = mechanical power × (1/efficiency − 1); duty-weighted loaded loss = loaded loss × duty fraction.
Peak force and stroke are captured for the RFQ; they do not enter these equations. Motor, drive, bearings, seals, preload, acceleration, return-stroke and idle losses are excluded. The worksheet does not calculate buckling, critical speed, life, temperature or safe duty. Input ranges are worksheet bounds, not catalog capacities.
Cleanroom air still transfers heat by convection. Cooling equipment needs facility assessment; no universal fan ban is established. High vacuum suppresses convection, leaving conduction and radiation. Without mount temperatures, thermal resistance and transient data, neither a low nor high wattage proves thermal suitability.
| Quantity / environment | Worksheet treatment | Required next step |
|---|---|---|
| Loaded screw loss | F × v × (1/η − 1), assuming constant positive motoring load | Validate efficiency at the actual load, temperature and speed. |
| Cycle-average loaded loss | Loaded loss × loaded duty fraction | Add return, preload, seals, bearings, motor/drive and idle heat. A simple average does not resolve transient peaks. |
| Air cleanroom | Conduction, convection and radiation can contribute | Facility approval for local airflow/cooling; there is no universal fan ban or safe 120 W threshold. |
| High vacuum | Convection is suppressed; conduction and radiation remain | Model interfaces, emissivity, mount temperature and transient heating, then validate thermally. No safe 35 W threshold is established. |
8. Metallurgy, Surface Treatments & Ultrasonic Cleaning Protocols
AISI 440C, Cronidur 30, 316L electropolishing, ASTM A967 passivation, and cleanroom double-bagging.
Select contact materials, external finishes, seals, cables and coatings as an assembly. A stainless outer housing does not establish corrosion resistance or cleanliness of the internal screw. Ask the supplier to document contact ratings, finish quality and exact-compound compatibility.
Validate cleaning and decontamination against the real concentration, temperature, humidity, dwell and exposure cycles. Peroxide liquid feed concentration is not chamber vapor concentration. No universal corrosion rate, safe cycle count, bakeout temperature or solvent recipe is established by this page.
| Component | Question for supplier | Acceptance evidence |
|---|---|---|
| Screw and rollers | Which hardened contact material meets fatigue, corrosion and magnetic requirements? | Material/heat-treatment traceability, contact rating and approved lubricant. Stainless housing does not imply stainless internals. |
| Exposed housing | Which finish and surface roughness support the cleaning process? | Finish inspection, cleanability validation and agent compatibility. No universal Ra value is specified here. |
| Seals and cable jackets | Will the exact compound survive the real decontamination cycle? | Time, concentration, temperature and cycle exposure data; include adhesive and cable-gland interfaces. |
| Coatings or ceramic contacts | Are cracking, adhesion and debris risks acceptable? | Whole-assembly wear, life and contamination tests. Treat these as custom engineering, not default upgrades. |
| Step | Control | Acceptance record |
|---|---|---|
| Disassembly / initial cleaning | Use material-compatible cleaning agents; protect contact surfaces | Agent, lot, exposure, rinse and drying instructions. Confirm current supply and handling with the vendor. |
| Residue and particles | Set process-specific NVR and particle limits before testing | Document sampling area, extraction method, detection limits and accepted results. |
| Bakeout if applicable | Respect grease, seals, electronics and coating temperature limits | Supplier-approved time/temperature/pressure record. Do not apply a generic bake cycle to an assembled actuator. |
| Assembly and packaging | Prevent recontamination with controlled handling and transfer | Clean assembly record, packaging compatibility and receiving inspection procedure. |
| Agent / process | Inputs to specify | Evidence required |
|---|---|---|
| Vaporized hydrogen peroxide | Actual vapor concentration, humidity, dwell, temperature and cycles | Exact material, compound and assembly exposure results. Liquid feed concentration is not chamber vapor concentration. |
| Alcohol surface wipe | Concentration, wipe method, frequency and ingress paths | Residue, coating, cable and seal compatibility. Surface wiping is not assembly sterilization. |
| Chloride or peracetic acid agent | Concentration, contact time, rinse and drying | Pitting, crevice corrosion and elastomer/adhesive compatibility on the actual assembly. |
| Steam / SIP | Temperature, pressure, heat-up and cooling cycles | Only expose the assembly if the supplier validates it; otherwise isolate the mechanism with a qualified process barrier. |
9. Failure Modes & Effects Analysis (FMEA) for Cleanroom Actuators
Identifying common root causes of contamination, virtual leaks, thermal binding, and backdriving.
Contamination, unplanned maintenance and lost containment can dominate actuator purchase cost. The risk register is a design review aid, not a completed safety assessment. Set severity and acceptance criteria for the actual machine.
Do not assume roller screw self-locking. Vertical loads need a rated holding or catch system and verified power-loss behavior. Static holding and emergency stopping duties require separate ratings. Include utilities, acceptance testing, maintenance and requalification in the cost comparison.
| Risk | Consequence | Mitigation / acceptance gate |
|---|---|---|
| Power-off backdrive | Vertical load or tooling moves after power loss | Design a rated holding/catch system. A holding brake is not automatically an emergency stopping brake; validate load and stopping duty. |
| Positive purge escaping outward | Debris reaches a wafer or sterile product zone | Capture exhaust and test direction with actual enclosure leakage; interlock unsafe pressure states. |
| Heat / lubricant migration | Position drift, contamination or shortened life | Validate full-cycle temperatures and grease quantity; agree maintenance access and intervals. |
| Seal or bellows degradation | Particle release or loss of vacuum | Supplier life data and replacement plan plus monitored pressure/leak testing. |
| Lifecycle cost underestimated | Utilities, validation, overhaul and requalification exceed budget | Itemize NRE/tooling, cleaning setup, special lubricant minimum orders, pumps, cooling, consumables, downtime and lot acceptance testing. Compare relocating the drive. |
10. Hypothetical Engineering Scenarios & Sizing Walkthroughs
Six illustrative calculations, not customer installations or measured test results. Temperatures, leak rates and cleanliness remain unverified.
Wafer handling — illustrative sizing
Assume 3.5 kN, 80 mm/s, 2 mm lead, 82% efficiency and 20% loaded duty.
Shortlist an enclosed drive with captured exhaust; compare supplier particle reports.
Vial capping — illustrative sizing
Assume 6 kN, 40 mm/s, 4 mm lead, 85% efficiency and 35% loaded duty.
Compare an inverted package or an external drive behind a qualified process barrier.
Optical calibration — illustrative sizing
Assume 2 kN, 15 mm/s, 1 mm lead, 75% efficiency and 10% loaded duty.
Compare a vacuum-compatible drive with a defined conduction path against an external motor/feedthrough.
Panel lift — illustrative sizing
Assume 8 kN, 50 mm/s, 5 mm lead, 84% efficiency, 30% duty and 350 mm stroke.
Compare captured-exhaust sealing and bellows packaging; provide vertical load and return profile.
Reticle elevator — illustrative sizing
Assume 1.5 kN, 25 mm/s, 2 mm lead, 80% efficiency and 15% loaded duty.
Evaluate keeping the lubricated drive outside the sensitive volume; compare qualified feedthroughs.
Hot-cell filling — illustrative sizing
Assume 4.5 kN, 30 mm/s, 3 mm lead, 83% efficiency and 25% loaded duty.
Assess a process barrier, remote service access and containment pressure strategy with the facility team.
11. ISO 14644-14 Qualification Roadmap & RFQ Specification Gate
Structured testing sequence from ultrasonic degreasing to cleanroom double-bagging.
Agree the acceptance protocol before ordering. Identify the tested assembly, background, sampling channels and locations, operating cycle, uncertainties and pass limits. Extend the evidence package with thermal, vacuum, chemical and microbial tests as the process requires.
Reassess suitability when seals, lubricant, operating speed, cleaning process or containment utilities change. The diagrams are qualitative planning aids, not test results or a substitute for the licensed test standard.
| Requirement | Provide now | Supplier must return |
|---|---|---|
| Motion and load | Force versus position/time, stroke, speed, acceleration, orientation, return and idle cycle | Capacity, critical speed, buckling, life and motor/brake sizing calculations. |
| Environment | Air class and particle sizes, process pressure, gas species, temperature, cleanliness and microbial needs | Tested configuration and clear limits of claimed suitability. |
| Containment | Process leak budget, pressure direction, utilities and failure behavior | Barrier drawing, pump/exhaust design and interlock requirements. |
| Acceptance | Sampling protocol, background, test cycle and pass/fail limits agreed before order | Traceable test report for the exact assembly, with exclusions and maintenance/requalification triggers. |
12. Cleanroom Roller Screw Actuator FAQs
Comprehensive answers addressing cleanroom standards, mechanics, dynamic sealing, PFPE grease, and procurement.
What does ISO 14644-14:2026 establish?▼
It addresses equipment suitability with respect to airborne particle cleanliness. Record the exact tested configuration and operating envelope. It does not qualify sterility, cleanability, outgassing or thermal performance.
Can this tool certify an ISO class?▼
No. The selected class is an RFQ target, not a predicted result. Request an equipment suitability report with background conditions, sampling plan, motion cycle, load and orientation.
Is Grade B always ISO Class 5?▼
No. Annex 1 Table 1 gives Grade B ≥0.5 µm classification limits of 3,520/m³ at rest and 352,000/m³ in operation. GMP also adds process and microbiological controls.
What belongs in a particle-test report?▼
Include assembly identity, preparation, background counts, particle channels, sampling locations and flow, speed, stroke, load, acceleration, duration and orientation. Agree the protocol with the test laboratory; this page does not prescribe universal sampling distances.
Does a roller screw inherently emit fewer particles than a ball screw?▼
No particle ranking can be inferred from the mechanism name. Contact geometry, preload, lubrication, seals, speed, wear and the enclosure all matter. Compare assembled equipment under equivalent operating conditions.
Can rolling contacts still create debris?▼
Yes. Rolling contacts can include sliding and lubricant shear. Treat the screw, guides and seals as possible contamination sources and validate containment rather than assuming zero wear.
Do roller screws hold a vertical load after power loss?▼
Do not assume self-locking. Require a load-rated holding or catch system and a power-loss test. Select stopping provisions separately: a static holding brake is not automatically rated for dynamic emergency stops. Include brake wear debris and motor/encoder/cable materials in the containment and outgassing assessment.
Does a fine lead guarantee positioning accuracy?▼
No. Travel per revolution sets kinematics, while accuracy also depends on lead error, compliance, backlash, feedback, control and temperature. Verify the complete positioning error budget.
When should bellows be shortlisted?▼
When a flexing boundary can separate the mechanism from the process within the available stroke and space. Check pressure thrust, buckling, fatigue, side load and the tested leak budget. No ISO class alone mandates bellows.
Can bellows be assumed to have infinite fatigue life?▼
No. Obtain supplier cycle data for the exact geometry, displacement, pressure and temperature. Use a rated replacement interval; no generic stroke percentage establishes infinite life.
What does differential pumping change?▼
A pumped intermediate cavity can reduce gas transport across the final seal. Performance depends on leakage, gas species, seal geometry, line conductance and pump speed at pressure. It does not imply a fixed orders-of-magnitude reduction.
How should the extraction line be sized?▼
Separate atmospheric particle extraction from vacuum gas-load control. For vacuum design, evaluate conductance and effective pumping speed at each stage and confirm pressure in operation; facility suction is not a high-vacuum pumping specification.
How should trapped volumes be handled?▼
Identify blind volumes and poorly vented interfaces in the vacuum design. Agree compatible vent paths, cleaning and leak checks with the chamber designer; this worksheet does not resolve them.
Does PFPE chemistry guarantee optical cleanliness?▼
No. Exact formulation and temperature matter. Chemours lists low typical vapor pressure for Krytox LVP, but that value cannot be generalized to all PFPE greases or used as an assembled-system deposition guarantee.
Does ASTM E595 define a universal pass threshold?▼
The method measures mass loss and collected condensables under defined conditions. NASA uses ≤1.0% TML and ≤0.10% CVCM as screening criteria in the cited guide. Process acceptance, especially near optics, may require stricter or different evidence.
How much grease should be specified?▼
Use the screw supplier’s validated amount and relubrication plan for the exact speed, load, orientation and temperature. There is no universal 15–20% cleanroom fill rule; overfill and underfill both carry risks.
Is H1 registration enough for an aseptic process?▼
No. Incidental-food-contact suitability does not establish sterile-process qualification. Keep lubricant isolated from critical process contact and validate the contamination control strategy.
Can a generic bakeout or ultrasonic recipe be reused?▼
Only after checking the actual materials, lubricant, electronics and seals. Define residue and particle acceptance first, then validate a compatible cleaning, drying, handling and packaging process.
Why is thermal suitability marked Not assessed?▼
The worksheet calculates loaded screw friction, not temperature. Thermal resistance, mount temperature, motor/bearing/seal losses, transient operation and the rest of the cycle are unknown. Even a small average heat load can matter in a poorly coupled vacuum installation.
Are cooling fans universally forbidden in cleanrooms?▼
No universal prohibition is established here. Local flow, particles and heat sources require facility assessment. Vacuum suppresses convection; atmospheric cleanroom airflow can still remove heat.
Does changing motor type solve vacuum integration?▼
No. Motor insulation, magnets, encoder, cables, lubrication and heat paths need qualification as an assembly. Consider relocating the drive outside the chamber and compare the feedthrough tradeoffs.
What is the minimum RFQ package?▼
Send the complete load/motion/time profile, orientation, pressure or particle target, contamination limits, temperatures, utilities, maintenance constraints and required acceptance evidence. Export the brief, then add these process details.
What must be agreed before placing an order?▼
Agree traceable capacity checks, a configuration-specific particle test, vacuum/leak or microbial/chemical tests as applicable, thermal validation, power-loss behavior, cleaning and requalification triggers. One test does not cover all hazards.
Is one helium leak-rate limit suitable for every actuator?▼
No. Set a process gas-load budget and specify test method, tracer conditions, pressure differential, motion state and detection limit. A measured helium leak rate does not itself establish particle containment or lifetime.
13. Authoritative References & Related Engineering Guides
Sources checked 12 November 2026; next editorial review by 12 November 2027, or earlier if sources change. Public abstracts establish scope; full test protocols require the applicable standard. Editorial comparisons and hypothetical examples are not product test data.
Authoritative Engineering References
- ISO 14644-1:2015 — Air cleanliness classification ↗
ISO — Classifies air cleanliness, not a bare screw. Use the specified particle size and occupancy state; equipment suitability requires separate assessment.
- ISO 14644-14:2026 — Equipment suitability by airborne particle concentration ↗
ISO — Edition 2, published February 2026. Covers airborne particle suitability; excludes biocontamination, cleanability, material selection and thermal properties. Public abstract checked; full test protocol must use the licensed standard.
- NASA Outgassing Database User Guide ↗
NASA GSFC — Explains specimen testing at 125°C for 24 hours with a 25°C collector. The ≤1.0% TML / ≤0.10% CVCM criteria are NASA screening criteria, not universal ASTM pass limits or an optical cleanliness guarantee.
- Krytox LVP product information (February 2024) ↗
Chemours — Lists typical vapor pressure <1×10⁻¹³ Torr at 20°C and <1×10⁻⁵ Torr at 200°C. This sheet does not give a traceable ASTM E595 TML/CVCM test record. Properties cannot be generalized to other PFPE products.
- EU GMP Annex 1 — Manufacture of Sterile Medicinal Products (2022) ↗
European Commission — Table 1 distinguishes classification at rest/in operation; Table 5 covers monitoring. Grade B at rest and in operation have different limits. Particle classification alone does not establish sterility.
- Small Spacecraft Technology — Thermal Control ↗
NASA — Supports the conduction/radiation distinction in vacuum. It does not establish any cleanroom actuator wattage threshold, allowable temperature or capacity.
- Conductance Made Simple — Effective Pumping Speed ↗
Agilent — Explains how line conductance changes effective pumping speed and pressure. No universal particle capture percentage or pump size follows from this reference.
Related Linear Motion Guides
- Cleanroom Roller Screw Electric Cylinder Guide
Enclosed rod-style cylinder sizing, piston breathing air displacement, and rod gland vacuum scavenging.
- Cleanroom Planetary Roller Screw Actuator Guide
Detailed planetary mechanism focus with synchronous ring gear kinematics.
- Cleanroom Recirculating Roller Screw Actuator Guide
Micro-lead cam reset mechanics for sub-micron precision wafer positioning.
- Ball Screw vs Roller Screw Engineering Comparison
Load capacity, contact stress, fatigue life, and particle generation physics.
- Roller Screw Actuator Sizing & Procurement Playbook
Comprehensive procurement checklist, supplier RFQ questions, and cost factors.
- 3A Sanitary & Wash-Down Roller Screw Actuators
Hygienic design principles, FDA materials, and IP69K washdown sealing.
- Complete Industrial & Cleanroom Product Catalog
Standard and custom high-force electric cylinders and linear actuators.
Request Cleanroom Actuator Engineering Review
Submit your motion parameters, cleanroom class target, and thermal boundary conditions to our precision application engineering team for customized sizing, particle containment analysis, and preliminary CAD models.
Inquiry Email
Include force, stroke, speed, duty cycle, life target, quantity, and delivery country.
Send actuator specs to [email protected] or WhatsApp WhatsApp Engineering Support for an engineering review.